Primary Route

LI
U6
1.2 km
Fully ExistsGood Quality
✓ All Ages & Abilities
Serving
School / University
Industry
Status Updates

No upgrades planned

Cork Cycle Network Plan 2017
Proposed Type
Two-Way Cycle Track
Text from PDF (verbatim)

Road Name:
Future Link to Dunkettle Interchange

Section (where applicable):
To R623

Existing Facility and Quality of Service (QoS):
There are currently no dedicated cycling facilities along this route.

Proposed Infrastructure Type:
This is proposed as a primary route with a fully segregated two-way cycle track that will be delivered as part of the Dunkettle Interchange upgrade. This proposal will require new overbridge crossing of N25 as per emerging preferred scheme for cyclists through Dunkettle Interchange.

Key Locations Served:
Link to and from Dunkettle Interchange, east-west greenway, Glanmire and Cork City beyond.

Pinch Points/Constraints:
The delivery of this proposal is dependent on the final preferred design for cyclists through the Dunkettle Interchange.

Data from: Cork Cycle Network Plan 2017 - PDF (38MB)
Icons by Streamline