
Nothing is happening here
Road Name:
N20
Section (where applicable):
Pope's Quay to Assumption Road and Commons Road to
junction with Lower Kileens Road.
Existing Facility and Quality of Service (QoS):
There are currently no dedicated cycling facilities on this
route.
Proposed Infrastructure Type:
This route is proposed as a primary route connecting
the northern environs of the city and interurban route
IU-6 (to Blarney) directly with the city centre. The route
is currently a traffic dominated urban dual carriageway
with no cyclist facilities. This directness of this road
providing a connection directly to Cork City Centre from
the north is an advantage which should be exploited
for the benefit of cyclists, it will be a functional, direct
route which will improve journey times for cyclists,
increase safety for all road users by reducing vehicular
speeds, improve the overall environment of an area
currently dominated by traffic and also reduce vehicular
emissions and noise by reducing speeds. The current
layout of the road, with a hatched central median, wide
traffic lanes and grass verges means there is a lot of
underutilised roadspace which should be exploited in order to provide high quality segregated cyclist facilities
in both directions. This approach has been implemented
elsewhere where an urban dual carriageway, also a
National Primary route, has had high quality segregated
cyclist facilities retrofitted by reducing traffic lane
widths and utilising previously underutilised roadspace.
Figure 7.3 below illustrates the underutilised space
currently on the N20 while Figure 7.4 provides an
example of a high quality segregated cycle track which
has been retro fitted to an urban dual carriageway.
Figure 7.5 shows a potential future cross section for the
N20. 


Key Locations Served:
Surrounding residential area, primary and secondary
schools, Blackpool Shopping Centre, IU6 to Blarney and
the city centre
Pinch Points/Constraints:
Strategic standing of N20 as a national primary route,
although precedent has been set in establishing cycle
tracks on National primaries in other locations.